India has an installed generation capacity of 344,002 MW in a constrained grid (as on 31 March 2018) and a target of 175,000 MW installed renewable capacity by 2022, which is projected to be around 40% of the total installed capacity (around 437,500 MW). In this context, as commercially viable energy storage inches closer to reality, we are entering a disruptive phase which can redefine how evacuation and supply of power is undertaken in India over decades.